FILE: 001 / RZF-OPS STATUS: LIVE EST. 2026 WORLDWIDE

DEMOLISH
THE
PAPERWORK.

Razeforce is the AI back-office for demolition contractors. Drop a site brief, drawings, or photos — pull out quotations, RAMS, method statements, sequencing animations and crew training in minutes. Built by people who’ve actually torn buildings down.

14×
Faster Quotations
24/7
Async Delivery
37%
Avg. Bid Win Rate Lift
JOB TICKET // RZF-7841 ● PROCESSING
Project14-storey RC Tower
MethodTop-Down Mechanical
Volume~28,400 m³
Crew12 + 1 SHE Officer
PlantCAT 390F + LR / 2× HRD
Duration94 days
Quote£ 1,284,500
OutputPDF · DWG · MP4
Generating method statement... 73%
QUOTATION BUILDER RAMS & METHOD STATEMENTS 3D SEQUENCING CREW TRAINING DECKS WASTE & RECYCLING PLANS HAZMAT DOCUMENTATION EQUIPMENT ADVISOR BID PACKS QUOTATION BUILDER RAMS & METHOD STATEMENTS 3D SEQUENCING CREW TRAINING DECKS WASTE & RECYCLING PLANS HAZMAT DOCUMENTATION EQUIPMENT ADVISOR BID PACKS

You bid for buildings.
You shouldn’t bid for your weekends.

PAIN 01
7–14 DAYS

Quotations Take Forever

Every tender turns into a week of measuring, calling subbies, retyping the same scope. Half the time it’s rejected before the ink dries.

PAIN 02
£50K LOST

Wrong Method, Wrong Plant

Pick the wrong attachment for an RC frame and you’re bleeding teeth, time and margin. Picking right requires data you don’t always have on hand.

PAIN 03
COMPLIANCE

RAMS Are A Black Hole

Risk assessments and method statements get copy-pasted from old jobs. Inspectors notice. Insurers notice. Workers pay for it.

PAIN 04
CLIENT TRUST

Clients Want To See The Job

A 12-page Word doc doesn’t win the contract. A 90-second sequencing animation showing exactly how their building comes down does.

Eight services.
One workflow.

Every Razeforce service is delivered as a finished file — PDF, DWG, MP4, PPTX, XLSX, or DOCX — ready to send to clients, regulators, or your crew. You upload inputs, we deliver outputs. No call required.

SVC.01≤ 6 HRS

Quotation Builder

Drop drawings, site photos and scope notes — receive itemised quotes with labour, plant, fuel, waste, sub-contractor and overhead breakdowns. Adjustable templates per region.

IN: PDF / IFC / JPGOUT: XLSX + PDF
SVC.02≤ 12 HRS

RAMS & Method Statements

Auto-generated risk assessments and method statements per task, mapped to UK CDM, OSHA, EU-OSHA and AU WHS frameworks. Plug your company logo in — ready to submit.

IN: BRIEF + SCOPEOUT: DOCX
SVC.03≤ 48 HRS

3D Sequencing Animations

Show clients exactly how the building comes down. We turn your floor plans into a 60–120 second top-down or implosion sequence with phasing, exclusion zones and crane reach.

IN: DWG / IFCOUT: MP4 + PNG
SVC.04≤ 24 HRS

Project Schedules & Phasing

Gantt charts, critical path, weather-buffered timelines and lookahead schedules. Output ready for MS Project, Primavera, or printable site copies.

IN: SCOPE + TEAM SIZEOUT: MPP + PDF
SVC.05≤ 8 HRS

Equipment & Tooling Advisor

Tell us the structure type, location, access, and tonnage — we recommend the right machine class, attachments, attachments rotation, and rental partners. Includes fuel and consumable estimates.

IN: SITE BRIEFOUT: PDF MATRIX
SVC.06≤ 24 HRS

Bid & Tender Packs

Client-ready bid documents with executive summary, sequence narrative, sustainability metrics, and case-study appendix. Win the work, don’t just price it.

IN: RFP + CO. PROFILEOUT: PDF + PPTX
SVC.07≤ 12 HRS

Crew Training Modules

Toolbox-talk decks, equipment SOPs, hazmat protocols, lift plans — localised in 12 languages, ready for site briefings or LMS upload. Includes assessment quizzes.

IN: TOPIC + LANGUAGEOUT: PPTX + PDF
SVC.08≤ 36 HRS

Waste & Recycling Plans

Site Waste Management Plans (SWMP / EU CDW directive). Volume forecasts, recycling rates, hauler routing, and ESG scoring metrics for your sustainability reporting.

IN: VOLUMES + LOCATIONOUT: PDF + XLSX
SVC.09≤ 18 HRS

Hazmat & Asbestos Docs

R&D survey templates, removal method statements, air monitoring schedules, and licensed contractor coordination protocols — jurisdiction-specific.

IN: SURVEY DATAOUT: DOCX + PDF

Four steps. Zero meetings.

STEP / 01
01

Login & Pick Service

Single sign-on. Pick from the service catalog — quotation, RAMS, animation, training pack, the works.

STEP / 02
02

Drop The Inputs

Upload drawings, photos, RFPs, scope notes. Or just type the brief. We accept PDF, DWG, IFC, JPG, MP4, DOCX, XLSX.

STEP / 03
03

AI + Human QC

Our AI engine drafts, our demolition engineers QC every output before it lands in your dashboard. Zero hallucinated tonnage.

STEP / 04
04

Download & Send

Finished file lands in your portal & email, branded with your logo. White-label ready. Forward to client, regulator, or crew.

Razeforce-One.
Trained on real demolition, not theory.

  • [01]

    Domain-Tuned Reasoning

    A demolition-specific reasoning layer on top of frontier LLMs. Knows the difference between a primary frame and a secondary partition wall.

  • [02]

    Drawing & IFC Vision

    Reads structural drawings, BIM models, and site photos. Identifies columns, beams, slabs, services and clash zones automatically.

  • [03]

    Regulatory Library

    Live-updated against UK CDM, OSHA, EU-OSHA, AU WHS, IS 4130, and 18 other jurisdictions. Outputs match local requirements, automatically.

  • [04]

    Plant & Material Database

    2,400+ machine specs across CAT, Komatsu, Liebherr, Hitachi, JCB, Volvo. Live rental rates from 30+ markets. Real numbers, not placeholders.

  • [05]

    Human-In-The-Loop QC

    Every output is reviewed by a chartered engineer or licensed demolition supervisor before delivery. Your name goes on it — we make sure it’s right.

JOB.OUT
// razeforce.compute
project: "Brentford Tower / RC Frame"
stories: 14,
gross_volume_m3: 28401,
method: "top-down mechanical",
primary_plant: [
  "CAT 390F + 28m HRD",
  "CAT 352F + UHD",
  "CAT 320 + shear"
],
crew: { ops: 8, banksmen: 2, sho: 1 },
duration_days: 94,
recycling_rate_pct: 87.4,
co2_saved_t: 412,
» quote.xlsx
» rams.docx
» sequence.mp4
» bid_pack.pdf

Six verticals. One stack.

High-Rise Demo
Industrial Plant
Bridges & Infra
Power & Utilities
Residential
ESG & Recycling

Pick a plan.
Scale by job, not by seat.

Plans renew monthly. Cancel anytime. All tiers include unlimited team members — we charge by jobs processed, not user accounts.

TIER. 01 SUBBIE
$149/mo
Solo operators & small crews
  • 5 jobs / month
  • Quotation builder
  • RAMS & method statements
  • Equipment advisor
  • Email support · 24h SLA
  • Standard QC review
Start 14-Day Trial
TIER. 03 SITEFORCE
$1,990/mo
Enterprise & multi-site groups
  • Unlimited jobs
  • Everything in Foreman
  • Dedicated demolition engineer
  • Custom regional templates
  • API access + ERP integrations
  • SSO + audit logs
  • 4h SLA · phone hotline
  • Quarterly business review
Talk to Sales

— OR PAY-PER-JOB — FROM $79 / QUOTATION · $390 / ANIMATION · $129 / RAMS PACK

From contractors who’ve actually run the numbers.

We turned a 9-day quotation into a 6-hour quotation. We’re bidding on 4× more jobs and our margin’s up 11%. Razeforce paid for itself in week one.

R. KOWALSKIDIR · KOWALSKI DEMOLITION, UK

The 3D sequencing animation we sent the council won us the contract over two larger competitors. The client said it was the first time anyone had “shown” them how their building would come down.

M. PATELMD · IRONFRAME LTD, INDIA

RAMS used to be the job nobody wanted. Now it’s a 20-minute review instead of a 2-day write. Inspectors have stopped sending docs back.

D. NAVARROSHE MGR · NAVARRO BROS, SPAIN

My crew’s training packs are now in 4 languages. Toolbox talks actually land. Lost-time incidents dropped two quarters running.

K. OBIOPS DIR · WESTBANK CONTRACTING, NG

Common questions.
Direct answers.

Q.01

Is the AI just guessing tonnage and pricing?

No. Every quotation is grounded against a live database of regional labour rates, plant rental rates, fuel and disposal pricing, plus a 2,400-spec machine library. Outputs are reviewed by a chartered demolition engineer before delivery.

Q.02

What jurisdictions are supported?

RAMS, method statements and waste plans currently localise to 22 jurisdictions: UK, EU-27, US, Canada, Australia, NZ, India, UAE, Saudi Arabia, South Africa, Nigeria, Singapore, Malaysia, Indonesia, Brazil, Chile, Mexico, Egypt, Kenya. Adding 6 more in 2026.

Q.03

Who owns the output files?

You do. Razeforce holds zero IP rights over generated files. Outputs are white-labelled with your branding by default.

Q.04

How are uploaded drawings handled?

Files are encrypted in transit and at rest (AES-256), stored in EU/US/AU regions of your choice, and auto-purged 90 days after job completion unless you pin them. SOC 2 Type II in progress.

Q.05

Can I integrate with our ERP / project tools?

Yes — on the Siteforce tier. We support webhooks plus native connectors for Procore, Autodesk Construction Cloud, Sage, Xero, MS Project, and Primavera P6.

Q.06

What if a job needs revisions?

Every job allows 2 free revisions within 14 days. Just hit "Request Revision" on the dashboard with your notes. Average turn: under 6 hours.

Bring it down.
Faster.

Start your first job free. No credit card. Outputs delivered before you finish your morning coffee.

Start First Job Free →